Skip to product information
Project Planning Portrait Whiteboard - 60"x 40"
$718.38
Shipping calculated at checkout.
Description
About This
- Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
- Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system
Overview
- Brand : Creative Safety Supply
- Color : White
- Material : Aluminum, Metal, Vinyl
- Recommended Uses For Product : Office
- Mounting Type : Wall Mount
Care
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
Design
Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.